32 MOLESWORTH STREET

32 MOLESWORTH STREET

Status: Complete (2014-2018)

Client: Green Reit; Maples FS;

Size/Area: 4,645 sq.m

Sustainability Credentials: LEED Gold

BIM Level: Level 1

Awards: Commercial/Office Building of the Year" at the 2017 Irish Building and Design Awards.

We delivered the full civil and structural engineering design for the main building, along with engineering input for the fit-out phase.

The 32 Molesworth Street project involved the conservation refurbishment and extension of a protected Georgian building into a modern c. 50,000 sq.ft. office space. The project includes a five-storey rear extension connected to the existing building via a glazed three-storey atrium. The development also features a large courtyard and rooftop terraces. The building attained LEED Gold accreditation and won the "Commercial/Office Building of the Year" at the 2017 Irish Building and Design Awards.

The development involved the adaptive re-use of a protected Georgian structure with the construction of a modern five-storey extension over a single-storey basement. The building is a mix of refurbished heritage elements and new construction.

The fit-out included design and development of a walkway bridge to connect upper floors.

BACK TO COMMERCIAL LIST